Conditions

If you wish to hire the truck, you should know some rules and conditions necessary for the smooth and proper operation of the lift. By itself, aerial (AGP) – is very low maintenance machinery, but a number unaccounted for at the preparatory stage of the factors that could easily derail the entire process. So, we list the main criteria for the smooth operation of aerial platforms: – to provide access to the entrance truck, ie, work surface should be cleaned of debris, beams and other construction stuff. You should also drive the vehicles blocking the entrance to the object. – A ground on which you will be hoist should be flat (slope of the surface did not allow more than 5%) and stable, it is desirable to pour an even layer of crushed stone (no asphalt). Sander gerber aipac brings even more insight to the discussion. – You need to consider aerial route to be followed, otherwise, the lift can simply "stuck" in a narrow alley.

It is worth pay attention to the pipes and beams, which can limit the size of a passing vehicles. – To view the area where they will produce high-altitude work, may move the tower will be limited to the tree canopy or wires. These barriers usually can be overcome by choosing a different, more compact model aerial. – Before you order a rental truck, need to know the weight of cargo, which is planned to raise the height. If capacity is less than the tower, the work can be thwarted.

– At the stage of selection of special equipment for lease must specify the operator wishes to make, model truck, including the maximum heights of up to this type of aerial platforms. For example 17 or Sun aerial aerial AP 17 can rise to the level of only 17 meters above the ground, while the aerial APT 32 can operate at the level of 7-8 standard nine-floor. – If you plan execution of specific works, such as power tools, you need to arrange rental truck, equipped with cradles Electrical. – Operating rules for the truck, work at heights near the forbidden line power (must be aged at least 20 meters). We should also note that the aerial is operated under almost all weather conditions. Therefore, because of strong wind or cold should not cancel high-altitude work. However, we must understand that the manifestation of adverse weather can damage personnel, in addition, some processing operations should be performed only at a certain temperature and air rates ambient humidity. Aerial platform available for rent with driver, also a company that provides services to truck, usually a staff that is trained to work at height. Our company has aerial work permit in the city center, we are ready to assist in processing the necessary documents and provide personnel to work at height and its driver-operator.

Green Rock IISI

Thanks to its compact size (diameter of 1600mm and height 2250 mm) septic Green Rock IISI 6 can be mounted on a small scale, selecting to install an area of 3 x 3 meters. Before Mounting is necessary to determine the distance from home to the septic tank, as well as the depth of the discharge pipe. It should be remembered that the minimum distance from the house to sewage treatment plants should be 5 meters, and from intake of at least 25 meters. Enter sewer pipe in the septic Green Rock IISI 6 is located 900 mmot surface. Since the sewer is installed with a slope of 1.2 mmna meter, removing the septic tank from the house at a distance of 10 meters of sewer pipe the output should be no more than 80cm from the ground. At a deeper location of excretory tubes (recommended), enter the depth of sewer pipe in the septic Green Rock IISI 6 can be increased about by extension neck Green Rock.

The height of the extension neck is 0.5 meters. (Effective working height of 0.4 meters). By increasing the depth of the septic Green Rock IISI 6 ensures reliable system operation in winter. Maximum number of extension for openings that are used for mounting the installation should not exceed 2 units. In order to avoid expulsion of Green Rock IISI 6 of the earth under the influence of groundwater, installation is attached to the reinforced concrete slab with special eyelets located on the body of a septic tank. Slab is poured on the bottom of a prepared pit.

Plate Size is 2000 X 2000 m2 and a thickness of not less than 200mm. Check out incyte for additional information. At a high level groundwater around the perimeter of slab culverts are installed with the launch of the collecting well, which will continue to ensure the withdrawal of groundwater. To prevent the septic sprinkle sand, with periodic filling installation with water to equalize the pressure on the system chassis. In case if you can not take the treated water by gravity, you must install reinforced concrete precast well. It sets the drain float pump, which is the accumulation of water automatically triggered and pump out water to the desired location. Also in the collecting sump must be mounted vent risers for air supply into the system. Air required for activation of biochemical processes in the biofilter. Before starting the septic Green Rock IISI make sure you have fans riser, passing through the roof. Outlet riser facilitates extraction of gases from sewer system, formed during the biological process taking place in this setting. When the system polnosyu assembled, and tested the amount of water in the septic tank, plant included in the network through pre-programmed timer. Service septic Green Rock IISI. Maintenance includes periodic pumping of sludge from septic chambers. Removal of sludge produced by sewage disposals machine at least 1 time per year. Since the plastic loading biofilter biomass accumulates over time, it is necessary to rinse for at least 1 in every 2 years. Washing is done by a biofilter pressure washers or garden hose with normal high pressure water. For efficient operation of septic Green Rock IISI to the continued use of coagulant Aqua Stone tablets.

The Tank

If this is your bathroom will be the most convenient and functional. Installation systems for overhead plumbing GEBERIT Duofix have a wide range of applications and appointments the width and height of mounting elements, and the appointment before setting capital or non-capital walls. GEBERITrashoduyut system only the required amount of water is a simple and practical solution is applied to absolutely any solution for the bathroom GEBERIT.

Flushing mechanisms within the cistern flush and surface mount allow you to monitor the impact on the environment while saving money. Durability and reliable plumbing GEBERIT could not be better characterizes the policy of the company. Quality materials used in the manufacture of plumbing systems can serve a long time in materials for surface-mounted cisterns used scratch-resistant plastic that will never yellow. Even after many years of operation under the influence of intense sunlight of this tank is not completely lost its original pure white color. In addition, the installation of the tank does not require much effort and time. Connecting to the water supply by means of connecting the valve to be installed on the left, right or center of the tank. Actuator plates GEBERIT – manufactured in different designs, different colors and materials used in manufacturing. A variety of models allows for its own stylistic decision bathroom.

Technology

Notched trowel at this time are not needed, you could use either an ordinary, rather narrow, or trowel (trowel). Apply adhesive this time should not grooves, which are obtained by using a notched trowel, a small spanking (in groups) around the perimeter, the distance between them expose approximately 200 – 250 mm. Adhesive layer should vary from 5 mm to 25 – 30 mm, and it's already a given that you squeeze it a bit. Along the middle of the sheet piles are also empty, preferably in two rows through 400 mm from each other, in extreme cases – over 600 mm. The distance between the piles – 300 – 350 mm. Next page drywall placed on the pad and is aligned with the rules. Usually, test the vertical level, then apply a rule, and tapping him on lead sheet drywall in a strictly vertical position, but if you have combined instrument (usually a built-in level), then knock on it is not recommend.

Otherwise, very soon, this level will deceive you. It is better to attach it to the drywall to see what it shows clean, and slightly knock (you can just hand) in the area of the piles, which "asks" to be "drowned". That fact, and the entire second way. * Note: Depending on the situation, the adhesive can be applied to the sheet and not directly on the wall. But as In practice, the list – much easier. Method of cladding number three – for a very rough walls. He has not quite frameless, only frame is not from the profile, and the … drywall.

Let me explain. Of drywall cut wide strips of 100 mm. Exactly how much – depends on the height and width of the wall. These strips are glued to the wall around the perimeter, plus vertically every 600mm (available with 400, will not be worse). These bands called "beacons". The result is almost the same frame as the profile of just drywall it has not screwed, glued and. The plane is controlled by those same rules and levels, and reached different layer Glue strips of plasterboard for somewhere smeared a little, and sometimes – to 20 – 25 mm. If you are the beacons of the wall is strong enough, there is a chance to hide the wiring without shtrobleniya, simply attach it to the wall, only the beacons in places where it goes, is interrupted. When the glue has hardened under the sheetrock, you can begin to glue the sheets. Of Technology, drywall to the lighthouse is supposed to stick to the same adhesive plaster, which is described in the first method, but possible and on the other hand, does not become worse. On the liquid nails, for example. Will hold even better, but so much more. It is even possible to flush the foam, but without the necessary skill to do so would not advise. Foam with this method is applied at all little, and pressed drywall to be beacons is very strong, and constantly running out, within an hour. Otherwise razopret, the foam – she is. True, if done correctly, then tear off drywall from lighthouses to be in principle impossible to keep it on the conscience. But again, if you are a beginner in this business – it is better to play it safe. Because if you miss the point of pressing, and the foam still expands, forming a mound on the drywall, this is not correct out, only to break and remake.

Construction Equipment

In this article I propose to touch on packaging and equipment for construction, for which it is needed and how to choose the best solution for your business. The most common products: equipment packaging allows operations such as automatic and n / automatic strapping cargo polymer ribbons, hand rail freight. Is a manual of welding semi-automatic, and lentorazmatyvateli palletoobmotchiki, and more. Rail freight polymeric ribbons – an operation with a gun, after the installation of the goods on the table, the automaton, the limit switch is activated, the machine binds cargo, pulls, cuts and welds tape. Diesel trucks are performed in different models. They are used for accurate loading of goods of any kind.

From loaders easily administered transportation of oversized and heavy cargo. Due to the high maneuverability, loaders have proven to be a large warehouse, and small businesses. Diesel trucks are much more efficient, more powerful and more economical than other types of trucks. Packing tape. Polyester packing tape has a tensile strength (1,000 kg). Packaging provides the cargo during transportation, handling and storage. Flexible packaging is designed primarily to maintain products in their original form.

PP packing tape – designed to pack as using hand tools, and using machine guns and semiautomatic. Packing tape has high strength and geometrical parameters. Brace, corner buckle – for bonding polypropylene tape to protect the cargo from the contraction of the faces used protective corners and much more. Warehouse trolleys are widely used for transporting goods of various types and complexity. Widely used in small warehouses. Company Lavsan Plus successfully operating in the packaging technology. Sale of trucks by delivery to the warehouse to the customer.